Image | Project Details |
---|---|
![]() |
SARAWAK ENERGYSUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF FIBRE OPTIC LINKS PHASE 2 UNDER RURAL ELECTRIFICATION PROJECT-SIMILAJAU EHV SUBSTATION TO SEBAUH 33KV SUBSTATION |
![]() |
SACOFAPROPOSED AWARD OSP ENGINEERING SERVICES FOR MIRI FTTH: TAMAN TUNKU |
![]() |
SACOFAPROVISSION OF ENGINEERING SERVICE AND CIVIL INFRASTRUCTURE FOR FIBRE OPTIC WORKS AT MILE 10 TO MILE 15 9KUCHING SERIAN ROAD) (PR100701) |
![]() |
TELECOM MALAYSIA BERHADCONSTRUCTION OF BEACH MANHOLE (R2A) & HDD INSTALLATION WORKS AT MIRI LANDING STATION, KUCHING (SKR1M PROJECT) |
![]() |
TELECOM MALAYSIA BERHADCONSTRUCTION OF BEACH MANHOLE (R2A) & HDD INSTALLATION WORKS AT BINTULU LANDING STATION, KUCHING (SKR1M PROJECT) |
![]() |
OPTIC MARINE SERVICESOFF-SHORE SUB-MARINE CABLE PULLING WORKS AT TG LOBANG BEACH MANHOLE (BMH), MIRI (SKR1M PROJECT) |
![]() |
OPTIC MARINE SERVICESTHE PROVISION OF ENGINEERING SERVICES, CIVIL INFRA AND 2-WAY SKR1M KUCHING SHORE END CABLE PULLING WORKS AT BUNTAL |
![]() |
TELECOM MALAYSIA BERHADHDD INSTALLATION WORKS AT BUNTAL LANDING STATION, KUCHING (SKR1M PROJECT) |
![]() |
TELECOM MALAYSIA BERHADFIBER OPTIC RELOCATION WORKS AT LIMBANG T2-5, 76, T7 & T8 (FOR TM FIBRE OPTIC) |
![]() |
TELECOM MALAYSIA BERHADFIBER OPTIC RELOCATION WORKS AT FROM A SECTION AT MILE34 TO BINTULU FOR KOP, LEBUHRAYA BORNEO UTARA (FOR SACOFA F0 LINK) |
![]() |
SACOFAPROVISION OF ENGINEERING SERVICES AND CIVIL INFRASTRUCTURE FOR FIBRE OPTIC WORKS (LIMBANG) |
![]() |
SACOFAPROVISION OF ENGINEERING SERVICES AND CIVIL INFRASTRUCTURE FOR FIBRE OPTIC WORKS (SIMILAJAU SS - SUNGAI ASAP JUNCTION) |
![]() |
SACOFAPROVISION OF ENGINEERING SERVICES AND CIVIL INFRASTRUCTUCTURES FOR LINKS: SUBURMAS-SCF1, SCF1-SCF2, SUBURMAS-SCF1 (MJ) - SCF1 |
![]() |
SACOFAPROVISION OF ENGINEERING SERVICES AND CIVIL INFRASTRUCTUCTURES FOR FIBRE OPTIC WORKS (PACKAGE 3) UNDER Sibu Cluster 1 Sibu Cluster 2 Miri Cluster 1 |
![]() |
SACOFACONTRACT DATED 7 MARCH 2014 FOR THE PROVISION OF ENGINEERING SERVICES AND CIVIL INFRASTRUCTURES FOR FIBRE OPTIC WORKS (PACKAGE 1 - SIBU CLUSTER 1 AND MIRI CLUSTER 3 & 4) ("CONTRACT"0) UNDER Sibu Cluster 1 |
![]() |
SACOFACONTRACT DATED 7 MARCH 2014 FOR THE PROVISION OF ENGINEERING SERVICES AND CIVIL INFRASTRUCTURES FOR FIBRE OPTIC WORKS (PACKAGE 1- SIBU CLUSTER 1 AND MIRI CLUSTER 3 &4) |
![]() |
SACOFACONTRACT FOR THE PROVISION OF ENGINEERING SERVICES AND CIVIL INFRASTRUCTURES FOR FIBRE OPTIC WORKS ( PACKAGE 1 - SIBU CLUSTER 1 AND MIRI CLUSTER 3 & 4 |
© 2024 Telbina Technology Sdn. Bhd. All rights reserved.